Guides
Plain English answers on grid connections, tariffs, and behind the meter solar and storage.
Grid connections
How much power a site may draw and export, what happens when it needs more, and how a battery changes the answer.
What is maximum import capacity?
Maximum import capacity is the ceiling on power a site can draw from the grid. What MIC means, how it is charged, and what happens when a site exceeds it.
G100 export limitation explained for commercial solar
G100 is the ENA engineering recommendation behind an export limitation scheme, the control that caps a site's export, with how to size solar around it.
Will your grid connection take a charging fleet?
A charging fleet can push a site's peak demand past its grid connection. How to tell whether the connection has headroom, and what managed charging can do.
Solar export limits on commercial sites
A solar export limit caps how much power a site can send to the grid. What an export limit is, why network operators set one, and how it affects returns.
Bills and tariffs
What each line on a commercial electricity bill pays for, and which of them on-site solar and storage can reduce.
How to read a commercial electricity bill
A commercial electricity bill has far more than a unit rate: standing charges, capacity charges, network and policy costs, and VAT. Every line, decoded.
Embedded benefits: what on-site generation is really worth
Embedded benefits are the network charges distribution-connected generation once avoided. Reform cut most; on-site value sits in the charges avoided.
Load factor: what your site's demand shape tells you
Load factor is average demand divided by peak demand. What a site's load factor shows about its demand shape, and why a peaky site suits battery storage.
TNUoS charges explained
TNUoS charges cover a large site's use of the national transmission network, from a fixed capacity band to a demand element that a battery can cut down.
What are DUoS charges?
DUoS charges are what a site pays to use the local distribution network, split into red, amber and green time bands. What they mean, and how to read them.
Half-hourly data and settlement
Reading a site's half-hourly consumption, and what half-hourly settlement changes about the value of a battery.
How to read half-hourly electricity data
Half-hourly electricity data is a year of meter readings taken every 30 minutes. What the 17,520 numbers show about a site's demand, and how to read them.
What is a half-hourly meter (and what P272 means)
A half-hourly meter records your site's electricity every 30 minutes. What it is, and why the P272 reform moved mid-size sites onto half-hourly settlement.
P415: how half-hourly settlement changes battery value
P415 lets an independent provider trade a battery's flexibility in the wholesale market, settled half hour by half hour. What it changes about sizing.
Market-wide half-hourly settlement for large users
Market-wide half-hourly settlement (MHHS) settles every meter on its own half-hourly profile. What it changes for a large site already settled this way.
Solar and storage economics
What solar and battery storage cost on a commercial building, how they pay back, and how to screen sites for them.
Does commercial solar and battery pay back?
Solar and battery storage can pay back on a commercial site, but the payback period depends on demand, tariff and capital cost. How the sum is worked out.
Inverter clipping and the DC:AC ratio
Inverter clipping is energy lost when a solar array's DC output exceeds the inverter's AC rating. How the DC:AC ratio moves a commercial site's payback.
What commercial solar panels cost per kW in the UK
What commercial solar panels cost per kW in the UK, why the figure falls as systems grow, why the capacity basis changes it, and what sets the real cost.
Levelised cost of storage (LCOS) for batteries
Levelised cost of storage is the lifetime cost of a battery divided by the energy it delivers, a figure in pounds per megawatt hour. How it is worked out.
Screening a commercial portfolio for solar and storage
Portfolio screening ranks commercial sites on roof, demand, connection and tariff to find which ones justify a full solar and storage feasibility study.
Rooftop solar: splitting value between landlord and tenant
A landlord and tenant can split rooftop solar value through a roof lease, an on-site PPA or a private wire. Which one fits depends on who uses the power.
Solar self-consumption on a commercial site
Solar self-consumption is the share of a site's generation used on site rather than exported. How it is worked out from half-hourly data and what moves it.