G100 is the Energy Networks Association's engineering recommendation for an export limitation scheme, the control device that stops a site exporting more than the agreed cap. It lets a developer install more solar than a constrained connection would otherwise allow, by holding export at the connection point while the surplus is used on site or stored in a battery.

The Energy Networks Association's Engineering Recommendation G100 sets the technical requirements for export and import limitation schemes. An export limitation scheme is the control device that measures the power flowing at a site's connection and holds export at or below the limit the distribution network operator (DNO) has agreed. When a DNO caps how much a commercial solar site can send back to the grid, G100 is the standard that scheme is built and tested to. Fitting one lets a developer install a larger array than the cap alone would permit, with the surplus used on site or stored in a battery.

What G100 is

When a site applies to connect solar, the DNO grants an export capacity: the most power the site is permitted to push back onto the network. Where the local network is constrained, that figure can be set well below the array's full output, or at zero for a no-export connection. An export limitation scheme is what makes a capped connection workable, because it throttles the inverters, or disconnects them, before the power leaving the site rises above the agreed level.

G100 is the recommendation the scheme is built to. Published by the Energy Networks Association, it covers export and import limitation schemes, and sets out how the scheme must measure power at the connection, how quickly it must act, and how it is to be commissioned and tested. The practical effect is that the constraint applies to what leaves the connection rather than to what the array generates, so the array can be sized to the site's own use instead of to the export cap.

G98, G99 and where G100 sits

G100 is one of a set of connection recommendations published by the Energy Networks Association. Engineering Recommendation G98 covers fully type-tested small generators up to 16 A per phase, and G99 covers everything above it. On a single-phase 230 V supply, as declared by the Electricity Safety, Quality and Continuity Regulations 2002, that threshold works out at about 3.68 kW, the familiar maximum for a connect-and-notify domestic system.

G98 and G99 govern the generation connection itself: how the inverters behave and protect the network, and how the application is made. G100 is separate from both. It governs the limitation scheme that holds the site to an agreed export or import figure, and it is cited alongside a G99 application whenever a commercial site wants to connect more generation than its export cap would otherwise allow. A site can hold a G99 generation connection and a G100 limitation scheme at the same time, the first covering the array and the second capping what it exports.

Why a DNO caps your export

A capped connection exists because the local network cannot take the array's full output back onto it. The low-voltage network was laid out to deliver power to buildings, and when generation pushes current the other way the voltage at the connection rises. The Electricity Safety, Quality and Continuity Regulations 2002 fix the declared supply at 230 volts and allow it to vary only 10 per cent above to 6 per cent below, a window of 216.2 to 253 volts. Enough reverse flow on a constrained feeder lifts the local voltage through the top of that window, or loads a transformer or cable beyond what it was rated to carry.

Reinforcing the network to clear that headroom is slow and expensive, so a DNO will instead offer a connection on the capacity already available and hold the site to it with a G100 scheme. For a behind-the-meter solar project the cap is usually a fair exchange, because the array is there to cut the site's import bill and any export is a minor part of the return. The connection can proceed on the network's existing headroom rather than waiting on reinforcement.

How to size solar around a G100 limit

A G100 scheme takes its measurement at the site's connection point, where the supply meets the DNO's network, and holds the net flow there at or below the agreed export figure. Because the measurement sits at that boundary rather than at the inverters, the site's own consumption is netted off before the limit applies, which is what lets the array be sized to the building's load instead of to the export cap itself. The design starts from how much generation the site absorbs across the year and how much would be pushed up against the cap in the brightest half hours.

How close the array can run to the cap depends on how fast the scheme acts. The Engineering Recommendation G100 sets the time within which the scheme must bring export back below the limit once it is exceeded, and a quicker-responding scheme can be designed with less headroom beneath the cap, so more of the array's output reaches the connection before the inverters are throttled. A slower scheme has to hold a wider margin, and that margin curtails generation in the half hours the array runs hardest.

The scheme must also fail to a safe state if it loses the measurement signal. On a constrained connection that safe state is the agreed export figure, and on a no-export connection it is zero, so the design has to account for what the site does when it can no longer read the flow at the connection. The DNO witnesses that behaviour when the scheme is commissioned, before the site is allowed to run against the capped connection, so the response time and the fail-safe state are settled in the design rather than discovered at the witness test.

Where the connection permits no export at all, the scheme holds the flow at the connection to zero, and every half hour of surplus has to be used on site as it is generated or stored. A battery is then the only way to keep generation the scheme would otherwise throttle away, charging from the surplus the cap blocks and discharging later in the afternoon as the solar fades, or across the evening peak when bought electricity is dearest. It also lowers the site's draw against its import capacity in the half hours that set the charge.

Lupa models a G100 scheme at the point it measures, the site's connection, taking the half-hourly data and the electricity bill and solving each solar and storage combination against the agreed export figure. For a constrained or no-export connection, the platform shows how much of the output stays behind the limit and how much of the blocked surplus a battery recovers, read off the site's real load rather than a rule of thumb.

Common questions

Is G100 the same as an export limit?
No. The export limit is the figure the distribution network operator agrees, the most power the site may send back to the grid. G100 is the engineering recommendation that the scheme enforcing that limit is designed, installed and tested to. The DNO sets the agreed export figure; G100 sets the technical requirements the equipment enforcing that figure must satisfy.
Does a G100 scheme let me install more solar than the export cap?
Yes, and that is the main reason to fit one. A G100 export limitation scheme constrains what leaves the connection rather than what the array generates behind the meter, so a developer can install an array larger than the export cap alone would permit and consume or store the surplus on site. Without the scheme, the array would have to be sized to the export cap itself.
Who designs and signs off a G100 export limitation scheme?
The scheme forms part of the connection application made to the distribution network operator, usually alongside a G99 application for the generation itself. The operator reviews how the scheme measures power at the connection and how fast it acts to hold export below the agreed limit, and the scheme is commissioned and witnessed before the site is allowed to run against the capped connection.